Vertical Pipetting Station User Guide : Installing Vertical Pipetting Station : Unpacking Vertical Pipetting Station

Unpacking Vertical Pipetting Station
About this topic
This topic describes the shipping containers and how to unpack the Vertical Pipetting Station device.
Shipping containers
The Vertical Pipetting Station ships in the following containers:
Vertical Pipetting Station crate. Contains the Vertical Pipetting Station device.
Peripherals box. Contains the following packages:
Depending on the configuration ordered, additional packages or items can be included, such as accessories.
Before you start
Verify the following:
1
Vertical Pipetting Station utility kit contents. Verify the kit includes:
2
Site specifications. Ensure the installation site meets the requirements specified in the Laboratory requirements.
3
Required tools and equipment. Obtain the following:
Cart for moving the Vertical Pipetting Station
4
Personnel. Make sure two people are available for lifting the Vertical Pipetting Station from the crate.
 
WARNING  The Vertical Pipetting Station weighs 37.195 kg (82 lb). Do not attempt to move the Vertical Pipetting Station without assistance. Use proper lifting techniques when lifting the Vertical Pipetting Station.
Unpacking the Vertical Pipetting Station crate
IMPORTANT Save the packaging materials in case you are required to move or ship the Vertical Pipetting Station.
To unpack the Vertical Pipetting Station crate:
1
 
 
 
CAUTION Do not lift use the shelves, head mount, or any other moving parts to lift the Vertical Pipetting Station. Doing so can damage the device.
2
 
3
While firmly supporting underneath the Vertical Pipetting Station, lift it up and out of the crate.
4
Place the Vertical Pipetting Station in the upright position on the lab bench or table.
5
Remove the protective plastic bag covering the Vertical Pipetting Station, and remove the protective cushioning from between the shelves.
6
Verify that all Vertical Pipetting Station parts are free of possible shipping damage. If anything appears to be missing or damaged, contact Automation Solutions Technical Support.
Related topics
 
Mounting the Vertical Pipetting Station
Connecting the Vertical Pipetting Station