![]() |
To clean up the Vertical Pipetting Station after a run:
• Fixed-tip pipette head. Use the wash-tips task in Vertical Pipetting Station Diagnostics to wash the pipette tips.
• Disposable-tip pipette head. Use the tips-off task in Vertical Pipetting Station Diagnostics to remove the pipette tips.
b Fill the fluid reservoir bottle, replace the cap, and attach the fluid line that pumps towards the Vertical Pipetting Station to the cap connector.
c Empty the waste container, replace the cap, and attach the fluid line that pumps away from the Vertical Pipetting Station to the cap connector.
d To prime the fluid lines between the pump and reservoirs, use Vertical Pipetting Station Diagnostics to fill the lines with the appropriate fluid.
5 Check the run log file for errors. For details on the run log, see the appropriate software user guide, such as VWorks Automation Control User Guide.
Maintaining the Vertical Pipetting Station