|
A loss of power can be the result of either inadvertently turning off the power switch or a power failure. Regardless of the cause, a loss of power disrupts the communication between the Vertical Pipetting Station and the automation control software. You cannot resume a protocol that was running at the time of the power outage. To recover from the power outage safely, perform the following procedure.
1 On the Vertical Pipetting Station rear panel, ensure the power switch is set to the off (o) position and the air switch is set to the off (down) position.
3 If possible, cancel the run in the VWorks software.
For example, click Abort if an error message appears with options to Retry, Ignore, or Abort.
4 On the rear panel, press the power switch to the on (–) position.
5 Open Vertical Pipetting Station Diagnostics and initialize the correct profile. Ignore the low air-pressure warning. Wait until the pipette head moves upwards in the z‑axis to the top of its travel.
6
8 To continue an interrupted protocol task manually, use the Processes tab in Vertical Pipetting Station Diagnostics. See Running a process using Diagnostics software.
Opening Vertical Pipetting Station Diagnostics