|
This topic describes how to start up and shut down the Vertical Pipetting Station.Starting up the Vertical Pipetting StationTo start up the Vertical Pipetting Station:
1 On the Vertical Pipetting Station rear panel, check the air pressure gauge and verify the incoming air pressure is between 0.59–0.69 MPa (85–100 psi).
2 Verify that the power and serial communication cables are plugged into the Vertical Pipetting Station.
4 On the Vertical Pipetting Station rear panel, set the air switch to on (up), and press the power switch to the on (‑) position.
WARNING The shelves might move when you turn on the power and the air. Keep fingers, hair, clothing, and jewelry away from the Vertical Pipetting Station while it is in motion. Never touch any of the moving parts or attempt to move labware while the Vertical Pipetting Station is in operation. The device could pinch, pierce, or bruise you.
6 Start the VWorks software.Shutting down the Vertical Pipetting StationShut down the Vertical Pipetting Station before you:
• Clean the Vertical Pipetting Station
• Move the Vertical Pipetting StationTo shut down the Vertical Pipetting Station:
6 On the Vertical Pipetting Station rear panel, set the air switch to off (down), and press the power switch to the off (o) position.