Vertical Pipetting Station User Guide : Setting up Vertical Pipetting Station : Starting up and shutting down

Starting up and shutting down
About this topic
This topic describes how to start up and shut down the Vertical Pipetting Station.
Starting up the Vertical Pipetting Station
To start up the Vertical Pipetting Station:
1
On the Vertical Pipetting Station rear panel, check the air pressure gauge and verify the incoming air pressure is between 0.59–0.69 MPa (85–100 psi).
 
2
3
4
On the Vertical Pipetting Station rear panel, set the air switch to on (up), and press the power switch to the on (‑) position.
 
 
WARNING  The shelves might move when you turn on the power and the air. Keep fingers, hair, clothing, and jewelry away from the Vertical Pipetting Station while it is in motion. Never touch any of the moving parts or attempt to move labware while the Vertical Pipetting Station is in operation. The device could pinch, pierce, or bruise you.
5
6
Start the VWorks software.
Shutting down the Vertical Pipetting Station
Shut down the Vertical Pipetting Station before you:
Clean the Vertical Pipetting Station
Move the Vertical Pipetting Station
To shut down the Vertical Pipetting Station:
1
2
3
4
5
6
On the Vertical Pipetting Station rear panel, set the air switch to off (down), and press the power switch to the off (o) position.
 
Related topics