Cleaning up after a run
 
 
About this topic
This topic describes the post-run tasks you perform after a protocol run before running the next protocol.
Cleaning up after a run
To clean up the device after a run:
1 Ensure the tips are clean or fresh.
2 If a message appears and asks whether to release all racks, click Yes.
3 Remove used sample plates from the locations.
4 Ensure all Bravo head movement has stopped, and then remove any manually placed labware, and clean up any spills or debris.
5 Wash the liquid reservoirs and wash trays.
6 If the system has a Pump Module:
a (Optional) Wash the tubing and reinstall the reservoirs or wash trays. Ensure that the tubing is connected to the correct pumps.
b Fill the fluid reservoir bottle, replace the cap, and attach the fluid line that pumps towards the Bravo Platform to the cap connector.
c Empty the waste container, replace the cap, and attach the fluid line that pumps away from the Bravo Platform to the cap connector.
d To prime the fluid lines between the pump and reservoirs, use Diagnostics to fill the lines with the appropriate fluid.
7 Check the run log file for errors. For details on the run log, see the VWorks Automation Control User Guide.
8 (Weigh Station only) Recalibrate the Weigh Station if:
Moving the reservoir, wash station, and Weigh Station
Changing the tubing connected to the reservoir or wash station
Changing the liquid type used in the reservoir or wash station
More than two weeks have elapsed since the last Weigh Station calibration
 
 
Related information
 
For information about...
See...
Running logs, saving protocols, or using the Log toolbar
VWorks Automation Control User Guide
Running a task
Shutting down