Installation workflow
About this topic.
This topic presents the sequence of installation procedures for the BenchCel Microplate Handler. Typically, an integrated BenchCel Workstation will be installed for you.
 
 
Workflow
 
Step
For this task…
See…
1 
Verify that the installation location meets the site requirements.
2 
Unpack the computer and connect the monitor, power, mouse, and keyboard.
Manufacturer’s instructions
3 
Install the VWorks software.
VWorks Automation Control Installation Guide (VWorks 14.0 and later)
Software release notes (VWorks 13.1.x)
4 
Unpack the BenchCel device.
5 
Install the BenchCel risers, if applicable.
Agilent Technical Support
6 
Mount the robot head on the BenchCel device.
7 
Integrate external devices.
8 
Connect the BenchCel Microplate Handler:
Power
Pendant
Air supply
Computer
9 
Install the safety shield.
10 
Install the labware racks.
11 
Install the integrated devices.
Installation guide for the device.
12 
Set up the BenchCel device profile and set the teachpoints.
Related information
 
For information about…
See…
Installing external devices
External device user documentation
Setting up the BenchCel Microplate Handler
Defining labware, liquids, and pipetting techniques
VWorks Automation Control Setup Guide
Writing protocols in the VWorks software
VWorks Automation Control User Guide